Case Study

Many States. One Plan.

Multistate Utility Needed Utility Network

One of the largest electric and gas utility groups in the country needed to align multiple utilities, Utility Network domains, and systems under a unified operating model before migration.

CHALLENGE

A large electric and gas utility group with several operating companies across the Northeast planned to move from its legacy Geometric Network to the ArcGIS Utility Network. Each operating company had its own domains, legacy systems, asset and outage management integrations, and ways of working. Before any design or migration could begin, the utility needed a clear picture of data readiness and of how GIS was actually edited, used and maintained across all of those organizations, including the gaps and silos between them.

SOLUTION

RYKER joined a national consulting team as the Utility Network specialist. RYKER led in person workshops across multiple states with GIS, engineering, operations, asset management, IT and field services staff. The workshops captured how data is edited and consumed today, the workflows behind it, the gaps people work around, and what each group needs from the future system. Those findings fed directly into the architecture assessment, readiness validation, future state design and a proof of concept, while partner firms on the team assessed and cleaned data in selected substation and gas regulating station areas.

RESULT

The program gave the utility a shared, documented view of current workflows and future state requirements across its operating companies, grounded in what its own people said. That foundation shaped a proof of concept that delivered a configured, functional Utility Network for the selected areas, with legacy data mapped, migrated and validated. The utility also received readiness findings and remediation priorities to guide the phases ahead. The engagement showed how RYKER works as an extension of a larger team, bringing utility experience and Utility Network depth where it matters most.